TM 4-48.10 covers which procedures?

Prepare for the Camp SLO Air Assault (A.A) Phase 2 Exam. Use flashcards and multiple choice questions with hints and explanations. Get exam ready!

Multiple Choice

TM 4-48.10 covers which procedures?

Explanation:
TM 4-48.10 provides the procedures for rigging a load with a single pickup point for helicopter sling loads. It covers how to choose and configure the sling hardware, attach it to the load, and position the load so its center of gravity aligns with the single lifting point. It also details the necessary inspection and safety checks before lift. This single-point focus differentiates it from dual-point rigging procedures and from broader sling-load operations or ship-to-shore movement, which are addressed in other manuals or sections.

TM 4-48.10 provides the procedures for rigging a load with a single pickup point for helicopter sling loads. It covers how to choose and configure the sling hardware, attach it to the load, and position the load so its center of gravity aligns with the single lifting point. It also details the necessary inspection and safety checks before lift. This single-point focus differentiates it from dual-point rigging procedures and from broader sling-load operations or ship-to-shore movement, which are addressed in other manuals or sections.

Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy